#21814The system was then transferred from the RM task to the ATIS CSR task and a limited number of development tests performed.
tech,2-4-H91-1010,ak
and semiphone systems
</term>
. A new
<term>
training strategy
</term>
has been tested which , by itself
#21764A new training strategy has been tested which, by itself, did not provide useful improvements but suggests that improvements can be obtained by a related rapid adaptation technique.
tech,4-2-H91-1010,ak
system
</term>
. Some new variations in
<term>
semiphone modeling
</term>
have been tested . A very simple
#21734Some new variations in semiphone modeling have been tested.
measure(ment),9-3-H91-1010,ak
duration model
</term>
has reduced the
<term>
error rate
</term>
by about 10 % in both
<term>
triphone
#21749A very simple improved duration model has reduced the error rate by about 10% in both triphone and semiphone systems.
model,4-3-H91-1010,ak
been tested . A very simple improved
<term>
duration model
</term>
has reduced the
<term>
error rate
</term>
#21744A very simple improved duration model has reduced the error rate by about 10% in both triphone and semiphone systems.